Pacific Highway SW Water Main Replacement
Lakewood, WA
JMJ TEAM worked as a subconsultant to design a water transmission main replacement for the Lakewood Water District. The project included more than 2,000 feet of 16- and 20-inch pipe, a PSV/PRV station and several connections. JMJ TEAM completed the final design of all improvements including contract documents and assisted the water district during project construction.